Pump Station Assessment

Location: City of London, Canada
Population: 405,000
Purpose: Transient Mitigation

The operation of pumping stations can significantly impact the asset life of distribution systems and the amount of leakage in a system. Distribution systems are best maintained at consistent water pressures with minimal pressure spikes. Large and rapid swings in pressures are known to damage water systems and over time cause failure of watermains. Even before a watermain fails from these large swings in pressure, leakage at joints begins to increase as the transient events start to loosen the joints.

Continue reading “Pump Station Assessment”

City of London: Pump Station Assessment

Location: City of London, Canada
Population: 405,000
Purpose: Transient Mitigation

The operation of pumping stations can significantly impact the
asset life of distribution systems and the amount of leakage in a
system. Distribution systems are best maintained at consistent
water pressures with minimal pressure spikes. Large and rapid
swings in pressures are known to damage water systems and over
time cause failure of watermains. Even before a watermain fails
from these large swings in pressure, leakage at joints begins to
increase as the transient events start to loosen the joints.

Continue reading “City of London: Pump Station Assessment”
Top

Request a Demo

Thank you for your interest. Please fill out the form below and we’ll get back to you quickly to arrange a demo.



    Request a White Paper

    Thank you for your interest. Please fill out the form below and we’ll get back to you quickly with our latest white paper.